In 2013 we were appointed by the Parliamentary Estates Directorate to undertake a Design Review of the Mechanical & Electrical medium term works at the Houses of Parliament, which is a Grade I listed building and a World Heritage Site.
It had been some time since the Houses of Parliament had its heating, power and ICT infrastructure updated. This project saw the mechanical and electrical plant equipment updated and refurbished. S I Sealy reviewed the designs of this refurbishment, which included the water systems, steam infrastructure, electrical low voltage infrastructure systems and high voltage substations, ventilation, building management systems as well as the ICT infrastructure.