Lampton 6th Form College, Hounslow
Client: Extraspace Solutions
Budget: £2m
Completed: 2016
S I Sealy worked with Extraspace Solutions Ltd on this new-build modular 6th form Pavilion Building. This comprised the installation of 24 bespoke modular units to the ground floor of this new extension, in two rows of 12 units to form teaching areas, offices, stores and toilet facilities. A further 10 modules were placed on top of a steel frame erected to form a first floor recreation and study area.
The building consists of three structural elements: traditional steel frame, glulam timber frame and offsite modular steel framed units. The modular element and foundations below the modules have been designed to accommodate an additional floor. The building is clad with a blend of render and composite panels.
Large panel windows and doors have been used to the two stairwells to make these a feature and bring extra natural daylight into this area. Four Kingspan kerbs have also been fitted to the first floor roof in order to fit four ornamental rooflights to afford additional natural daylight to this study and recreation facility.
- Maximised Natural Daylight
- Rooflights