Ashford & St Peter’s Hospital, Office Block, Chertsey
Client: Extraspace Solutions
Budget: £2.5m
Completed: 2011
The requirement from Ashford & St Peter’s Trust was to provide a two-storey temporary office block at the hospital, with a BREEAM ‘Very Good’ Rating, whilst ensuring services within the complex were unaffected.
We worked with Extraspace Solutions on the resulting 2339 m2, a two-storey modular office building with a third-floor plant room. Each floor consists of a core area with toilet, staff changing area, staff kitchen and lift.
The office accommodation is arranged in a mix of open plan and cellular spaces, with half-glazed office partitions. The meeting rooms are located at ground floor level with a movable partition system subdividing the two smaller rooms.
- BREEAM Very Good