Basingstoke & North Hampshire LINAC, MRI and CT Facility
We were appointed to provide the detailed MEP design and construction phase duties for the new cancer treatment centre, with state-of-the-art cancer diagnostic & treatment equipment. A new LINAC laser machine was installed within a purpose-built concrete bunker which offers protection from the radiation emitted from the machine.
We attended several user group meetings and technical meetings with the manufacturer of the equipment and bunkers to deliver a co-ordinated and suitable MEP solution to heat, cool, power and ventilate and light the facility.
As part of the LINAC Building Facility for Basingstoke & North Hampshire hospital, an enabling works package had to be delivered to ensure the building had sufficient power, gas and water. A full feasibility study was undertaken, and RIBA Stage 3 & 4 reports were produced with detailed MEP budget costs to assist in the project planning & financing.
The site received the Bronze Award for the Considerate Constructors Scheme National Site Award in 2014. It was also shortlisted for the LABC Building Excellence Award for Best Public Service Building in 2014, and the Building Better Healthcare Award for Best Acute Hospital Development in 2015.