Location pin Find Us

Commercial

Digital Imagery of the co-operative Steeple Claydon store

Co-operative Steeple Claydon Store

We recently delivered the Building & Energy modelling, overheating analysis, climate change adaptation & mitigation reports and M&E design briefs for a low-carbon store design for The Co-operative Group. We were assigned to this project, along with AEW Architects, Ramboll (Structural Consultants) and Hilson Moran (Embedded Carbon), to define how a local Co-op retail outlook […]

Read More →

Cobbett House, Manchester

We provided the MEP engineering design from initial concept to detailed design and were appointed to provide construction phase monitoring for the refurbishment of Manchester NHS Foundation Trust’s Headquarters building, Cobbett House. The project involved the total refurbishment of the third & fourth floor within Grade II English Heritage listed building. Works also included the […]

Read More →

#Destinationbootle, Merseyside

We have delivered RIBA Stage 1-3 MEP energy modelling and concept design/planning duties. We are awaiting funding/instruction to proceed with the RIBA Stage 4 MEP detailed design and construction phase duties for this £33 million development on behalf of SAFE Regeneration. SAFE’s plan is to make their community within Bootle a destination for locals and […]

Read More →

Radius Campus, Crewe

We were employed by Pochin Developments Limited to provide strategic MEP design & cost advice together with performance duties for the M&E engineering services for this new BREEAM Very Good, 64,000sqft  Grade A office development for Radius Payment Solutions. The four-storey project at Crewe Business Park includes a gym, communal meeting areas and café. Our […]

Read More →

Wonderlab, Bradford

The Science Museum Group has a strong tradition of delivering highly successful, world-renown interactive galleries. We were appointed by the National Science and Media Museum to refurbish an existing experience TV area to create a new science ‘Wonderlab’ to form part of the re-launch for the National Science and Media Museum in Bradford. The objective […]

Read More →

Stockport Homes HQ, Cornerstone

We were appointed to provide feasibility, option appraisal and performance and construction phase duties for the new corporate HQ for Stockport Homes. This 55,000sqft high specification office development included a visitors’ reception, canteen, meeting rooms, open plan offices and management offices and basement car parking with mechanical extract ventilation.  The project is an exemplar low […]

Read More →

Private Commercial Development

The brief for this new building was that it should be a high specification office facility, providing flexible accommodation to support the client’s activities, both now and in the future. As the project needed to be completed in a short time frame, a fast-track modern off-site construction method was used to meet the client’s requirements. […]

Read More →
Trafford Point

Trafford Point

The Trafford Point project consisted of two large warehouse units (12,000m2) complete with office accommodation and extensive car parks and access roads. Each warehouse unit has a separate electrical sub-station feeding it, as well as dedicated water and gas supplies. S I Sealy provided full mechanical and electrical services designs for both buildings, plus the […]

Read More →

Corn Exchange, Manchester

We provided the detailed building services engineering design for the refurbishment of the Corn Exchange, an iconic building in central Manchester which has a Grade II listed façade as well as some internal areas. The landlord removed most of the existing tenants, and created a food and drink court over three floors. As such we […]

Read More →

Essar UK Administration Building, Cheshire

The first phase of the project was alterations and re-modelling of the existing 7th floor of the Administration Block to create Executive offices, together with a newly refurbished main entrance at Ground Floor Level.  The remainder of the building was refurbished over a phased period, lasting 5 to 7 years. We designed the detailed building […]

Read More →