The Co-operative Group’s new building is one of the most iconic on the Manchester skyline. S I Sealy was engaged to provide the detailed design of the new building in Manchester for The Co-operative Group. The building provides over 320,000sqft of Category A open plan office space. The building is fully BCO compliant and is […]
Read More →Commercial
This facility houses the administration centre for the RAIB in a rural setting, with cedar finish to the entire external of the building and overhanging canopy supporting solar shading which reduces any overheating. Internally, a mix of glazed screens and system furniture combine to offer an extremely modern and open feel to the offices.
Read More →S I Sealy worked for EIC on the design and build of a new £3.5m office facility for Atkins at the West Lakes Science & Technology Park near Whitehaven, Cumbria. Construction of the office, which was built to BREEAM rating ‘Very Good’, commenced in July 2014 with completion in May 2015. S I Sealy was […]
Read More →S I Sealy provided the detailed building services design for the refurbishment of Paul Smith’s store and offices in Albemarle Street, Mayfair. The building includes four storeys of offices plus a rooftop penthouse apartment. The ground floor is Paul Smith’s flagship store, whilst the basement is flexible enough to be used for retail or to […]
Read More →PP Plasma specialise in cutting metal sheets. S I Sealy has been employed to provide the building services design for PP Plasma’s new build factory and office accommodation. The office is 700sqm and the factory is 3,000sqm. We have undertaken a LZC report which includes the feasibility of recovering waste heat from the cutting machines, […]
Read More →This development is a proposed new build student accommodation block containing over 200 units. S I Sealy provided concept design and sustainability advice at pre-planning stage to assist the developer in obtaining planning permission. To achieve 10% onsite renewable, our renewable energy study recommended solar thermal hot water and photovoltaics. Communal heating and domestic hot […]
Read More →Paul Smith vertically extended the Headquarter Office in Kean Street, London. Sir Paul Smith was keen to make a design statement with this extension. S I Sealy provided pre-planning advice on this extension. We undertook carbon reduction studies, looking to include renewable energy technologies and ensuring Part L compliance.
Read More →We provided the detailed building services design for the Children’s Interactive Museum which forms part of the overall vision of the King Abdullah Financial District masterplan, intended to create a new financial district in the city of Riyadh. The development, which includes skywalks, offers a wide mix of offices, residential, educational, sports and cultural facilities […]
Read More →S I Sealy was employed by the architect, The Fairhurst Design Group, to provide full mechanical and electrical design and site supervision at Bank of East Asia’s office at 3-5 Charlotte Street, Manchester. The building, which is the Bank’s first UK site outside of London will incorporate a banking hall, private banking facilities, secure areas, […]
Read More →Pochin Contractors Limited was awarded the highly prestigious contract to build the new Welsh Assembly Governments regional headquarters building at Llandudno Junction after the extensive competition. As an integral part of the bidding team, S I Sealy was appointed to undertake the detailed M&E design and complex thermal modelling. To meet the client’s strong desire […]
Read More →