We worked with ESS Modular on this project, which included the manufacture, installation and fit-out of a new stand-alone single-storey classroom building extension, consisting of two class bases, WCs, storage, reception area, segregated plant room and associated groundworks and landscaping. As it was a requirement of the client brief to target energy levels and adopt […]
Read More →Education
We worked with ESS Modular on this project to provide a classroom extension to the existing Harris Junior Academy. The building is a single storey steel-framed modular building, formed from the installation of seven modular units. The new extension includes three classrooms (59m2 each), stores, and a boiler cupboard. PV panels were installed to the […]
Read More →S I Sealy worked with Extraspace Solutions Ltd on this new-build modular 6th form Pavilion Building. This comprised the installation of 24 bespoke modular units to the ground floor of this new extension, in two rows of 12 units to form teaching areas, offices, stores and toilet facilities. A further 10 modules were placed on […]
Read More →We provided the detailed building services engineering design for this modular building provided by Extraspace Solutions. The building is a four storey Learning Resource Centre which includes study rooms, a library and a café. In addition, there are offices on the top floor. The site infrastructure was linked into a District Heat Network. The building […]
Read More →This project was for The Girls Day School Trust, the UK’s leading network of independent girls’ schools with over 3,600 staff and nearly 20,000 students between the ages of three and 18. We provided the detailed building services design for the refurbishment of the existing Victorian School with a three-storey infill with a vertical core […]
Read More →We worked with Extraspace Solutions on this project, a Key Stage 5 modular building extending over 800m2 and including a 100m2 covered external patio area. The building was specifically designed to cater for the special needs of young adults aged 16 – 19. In order to incorporate a sustainable and accessible design sensory rooms, PMLD (Profound […]
Read More →Merton Council urgently needed additional Sixth Form accommodation within the Borough. Following a consultation period four new colleges received planning permission. They were located at four existing secondary schools in Bishopsford, Raynes Park, Ricards Lodge and Rutlish. As the requirement was so urgent the Council tendered the project based on an off-site modular constuction. This […]
Read More →We worked on this project with Extraspace Solutions which included the provision of two extensions; one within Grove Junior School, 368m2 and one within Grove Infant & Nursery School, 215m2. Both projects were formed from the installation of 21 modular units. The new extensions comprised of class rooms, staff rooms, cloakroom, WCs, lift and storerooms. […]
Read More →We worked with Extraspace Solutions on a 4 classroom extension for this primary school as well as a complete new nursery facility, totalling 1700m2, including administration rooms, meeting rooms, parent rooms, toilets and drying facilities, main receptions and kitchen facilities. External works started on site in February and the modular facility was in place by […]
Read More →We provided ACE full duties for Altrincham College of Arts – a new build sixth form college. These duties included full mechanical and electrical engineering design, contract management and site monitoring of the mechanical and electrical installation. The college includes a science lab, domestic science facilities, an art room, a drama studio, an ICT business […]
Read More →