Maggie’s Centre is adjacent to The Christie Hospital in Manchester. The building is the home of the Maggie’s charity which provides free practical, emotional and social support to cancer patients. We provided the detailed building services design for this inspirational new centre, which was designed by the world-renowned architect Lord Norman Foster. The building services […]
Read More →Healthcare
We provided the detailed design for the conversion of an old lift shaft into a centralised plant room, which would distribute heat throughout the whole hospital. There were no other disciplines involved in this project. We therefore attended site and took the measurements for the lift shaft and surrounding services. We drew the model of […]
Read More →The University of Bristol worked in partnership with University Hospitals Bristol NHS Foundation Trust to develop a new Translational Biomedical Research Centre. We provided the detailed designs for the new build state of the art heart surgery training facilities. This development includes a hybrid theatre, which provides angiographic imaging capabilities integrated within an operating suite, […]
Read More →Working with Extraspace Solutions, we delivered a mental healthcare project at the Kent and Medway NHS and Social Care Partnership Trust (KMPT), Medway Maritime Hospital. The project included an 18-bed young adult, mental health in-patient ward. The facility is linked to the existing Priory House building on two sides, where significant refurbishment was undertaken to […]
Read More →We were appointed to provide the detailed MEP design and construction phase duties for the new consultants’ facility at the Basingstoke & North Hampshire Hospital. The project delivered a stylish new private patients’ facility, incorporating 12 Consulting rooms, each with a Secretary’s office. The facility has an X-Ray department, treatment rooms and support staff offices. […]
Read More →We provided the detailed M&E design for this new three storey changing facility to accommodate the two new EVAR theatres within Addenbrooke Hospital. The new facility was designed to cater for both male and female staff and includes full changing facilities and gowning areas. The building is connected to the hospital on three levels through […]
Read More →We were appointed to the Trust’s Framework for building services engineering design. Through this framework we have successfully completed a number of projects including the refurbishment of: – A hybrid theatre – A maternity theatre – Cath Lab theatre – Histopathology – HV Ring main – And a feasibility report looking at the high voltage network
Read More →We provided the detailed building services engineering design for the major refurbishment and extension of the Jubilee Day Centre. This project increased the capacity of the day surgery accommodation. The project included: a new conventional operating theatre, recliner bays wards, trolley bay wards, stage one recovery rooms, changing room, offices and clean/dirty utilities. The Day […]
Read More →We were appointed to provide the detailed MEP design and construction phase duties for the new cancer treatment centre, with state-of-the-art cancer diagnostic & treatment equipment. A new LINAC laser machine was installed within a purpose-built concrete bunker which offers protection from the radiation emitted from the machine. We attended several user group meetings and […]
Read More →The Stepping Hill catering block is a new build kitchen facility designed to produce up to a maximum of 4000 meals per day. The hot production area comprised of two large cooking ranges, each with individual ventilation canopies, separate areas provides specialist cold kitchen and diet bay facilities. Ancillary areas include fruit and veg preparation, […]
Read More →