Location pin Find Us

Off-Site Construction

Collis Primary School, Teddington

We were appointed to provide the MEP design for the new two-storey 3FE school building and a small detached administrative block for Collis Primary School. The new school buildings were constructed using MMC (modern methods of construction), enabling significant elements of the works to be carried out off-site, enabling careful coordination and phasing so that […]

Read More →

The Olive School, Preston

This project involved the design and build of the two-storey 2FE school building featuring spacious classrooms for reception, infant and junior years, office space, a fully fitted school kitchen, workrooms, and a large sports hall. The building was constructed using modern methods of construction with all external doors, windows, internal partitions, and the first fix […]

Read More →

This project involved the design and build of two new two-storey modular buildings on the site of an existing 5FE Senior School. The overall project consisted of a new activity block to the south of the existing school which comprises activity studios, fitness suite, changing facilities and group rooms; and a new Science block to […]

Read More →

Abbey Infant School, Smethwich

Abbey Infant School has a population of 317 children from years 3-7, with a nursery block providing care and education for 3-4-year-olds in a separate area with access to an outdoor learning area. We provided the detailed building services design for this Modular Offsite ESFA Framework project for Spatial Initiative. The project required the complete […]

Read More →

Highcliffe Primary School, Leicester

This project involved demolishing the existing junior school and replacing it with a new single-storey modular building with a multi-purpose hall, kitchen facilities, library, SEN therapy facilities and general teaching classrooms. The school remained in full operation throughout the works, so minimal disruption was required. This was achieved through careful coordination and phasing. The new […]

Read More →

Whitehall Park Primary School, Islington

We provided the detailed building services design for this project for ESS Modular.  With a contract value of £5.5m, this project involved the demolition of the existing Ashmount School, a locally listed Grade A building and the construction of Whitehall Park Primary School, a new primary (4-11) 2FE. The gross area of the building is […]

Read More →

Paxton Primary School, Lambeth

Paxton Primary School, a one form entry (236) place school for pupils aged 3-11, was transformed into a state of the art three form entry school to accommodate 720 children using volumetric technology. Situated on a split level site, the £8.25 million, 3736m2 school in the London Borough of Lambeth, included 23 classrooms over three […]

Read More →

The University of Bristol worked in partnership with University Hospitals Bristol NHS Foundation Trust to develop a new Translational Biomedical Research Centre. We provided the detailed designs for the new build state of the art heart surgery training facilities. This development includes a hybrid theatre, which provides angiographic imaging capabilities integrated within an operating suite, […]

Read More →

Northmoor Academy, Oldham

We provided the detailed building services design for this project in Oldham, Greater Manchester, which provides a new 3FE Design and Build Primary School. The site was originally a three storey Secondary School.  The first stage of the project was to completely demolish the building. The project was to develop a 2 storey block, with a steel […]

Read More →

Hollinwood Academy, Oldham

We provided the detailed building services engineering design for this new build school for Extraspace Solutions.  The project was for the New Bridge Academy Trust for students aged 4-19 with additional needs.  The school includes a range of specialised provision for young people who may be on the autistic spectrum.  The facilities include a Sport […]

Read More →