Location pin Find Us

Off-Site Construction

Lordship Farm Primary School, Hertfordshire

We worked with ESS Modular on this project, which included the manufacture, installation and fit-out of a new stand-alone single-storey classroom building extension, consisting of two class bases, WCs, storage, reception area, segregated plant room and associated groundworks and landscaping. As it was a requirement of the client brief to target energy levels and adopt […]

Read More →

Medway Maritime Hospital, Emerald Ward, Kent

Working with Extraspace Solutions, we delivered a mental healthcare project at the Kent and Medway NHS and Social Care Partnership Trust (KMPT), Medway Maritime Hospital. The project included an 18-bed young adult, mental health in-patient ward. The facility is linked to the existing Priory House building on two sides, where significant refurbishment was undertaken to […]

Read More →

Harris Junior Academy, Carshalton

We worked with ESS Modular on this project to provide a classroom extension to the existing Harris Junior Academy. The building is a single storey steel-framed modular building, formed from the installation of seven modular units. The new extension includes three classrooms (59m2 each), stores, and a boiler cupboard. PV panels were installed to the […]

Read More →

Lampton 6th Form College, Hounslow

S I Sealy worked with Extraspace Solutions Ltd on this new-build modular 6th form Pavilion Building. This comprised the installation of 24 bespoke modular units to the ground floor of this new extension, in two rows of 12 units to form teaching areas, offices, stores and toilet facilities. A further 10 modules were placed on […]

Read More →

We provided the detailed building services engineering design for this modular building provided by Extraspace Solutions. The building is a four storey Learning Resource Centre which includes study rooms, a library and a café. In addition, there are offices on the top floor. The site infrastructure was linked into a District Heat Network. The building […]

Read More →

We were appointed to provide the detailed MEP design and construction phase duties for the new consultants’ facility at the Basingstoke & North Hampshire Hospital. The project delivered a stylish new private patients’ facility, incorporating 12 Consulting rooms, each with a Secretary’s office. The facility has an X-Ray department, treatment rooms and support staff offices. […]

Read More →

We provided the detailed M&E design for this new three storey changing facility to accommodate the two new EVAR theatres within Addenbrooke Hospital. The new facility was designed to cater for both male and female staff and includes full changing facilities and gowning areas. The building is connected to the hospital on three levels through […]

Read More →

Rail Accident Investigation Bureau

This facility houses the administration centre for the RAIB in a rural setting, with cedar finish to the entire external of the building and overhanging canopy supporting solar shading which reduces any overheating. Internally, a mix of glazed screens and system furniture combine to offer an extremely modern and open feel to the offices.

Read More →

Brookfields SEN School, Reading

We worked with Extraspace Solutions on this project, a Key Stage 5 modular building extending over 800m2 and including a 100m2 covered external patio area. The building was specifically designed to cater for the special needs of young adults aged 16 – 19. In order to incorporate a sustainable and accessible design sensory rooms, PMLD (Profound […]

Read More →

Merton Sixth Form Colleges, Morden

Merton Council urgently needed additional Sixth Form accommodation within the Borough. Following a consultation period four new colleges received planning permission. They were located at four existing secondary schools in Bishopsford, Raynes Park, Ricards Lodge and Rutlish. As the requirement was so urgent the Council tendered the project based on an off-site modular constuction. This […]

Read More →