Location pin Find Us

Public Sector

Wythenshawe Hospital

We were appointed to the Trust’s Framework for building services engineering design. Through this framework we have successfully completed a number of projects including the refurbishment of: – A hybrid theatre – A maternity theatre – Cath Lab theatre – Histopathology – HV Ring main – And a feasibility report looking at the high voltage network

Read More →

We provided the detailed building services engineering design for the major refurbishment and extension of the Jubilee Day Centre. This project increased the capacity of the day surgery accommodation. The project included: a new conventional operating theatre, recliner bays wards, trolley bay wards, stage one recovery rooms, changing room, offices and clean/dirty utilities. The Day […]

Read More →

Merton Sixth Form Colleges, Morden

Merton Council urgently needed additional Sixth Form accommodation within the Borough. Following a consultation period four new colleges received planning permission. They were located at four existing secondary schools in Bishopsford, Raynes Park, Ricards Lodge and Rutlish. As the requirement was so urgent the Council tendered the project based on an off-site modular constuction. This […]

Read More →

Grove Junior & Infant School, Essex

We worked on this project with Extraspace Solutions which included the provision of two extensions; one within Grove Junior School, 368m2 and one within Grove Infant & Nursery School, 215m2. Both projects were formed from the installation of 21 modular units. The new extensions comprised of class rooms, staff rooms, cloakroom, WCs, lift and storerooms. […]

Read More →

Onthank Primary School, East Ayrshire

We worked with Extraspace Solutions on a 4 classroom extension for this primary school as well as a complete new nursery facility, totalling 1700m2, including administration rooms, meeting rooms, parent rooms, toilets and drying facilities, main receptions and kitchen facilities. External works started on site in February and the modular facility was in place by […]

Read More →

Altrincham College of Arts

We provided ACE full duties for Altrincham College of Arts – a new build sixth form college. These duties included full mechanical and electrical engineering design, contract management and site monitoring of the mechanical and electrical installation. The college includes a science lab, domestic science facilities, an art room, a drama studio, an ICT business […]

Read More →

The Grange Senior School 6th Form, Hartford

We had previously designed the M&E services for The Grange Junior School sports hall redevelopment.  Due to the project’s success, we were invited to produce the full detailed M&E designs for the Senior School Sixth Form and Sports Hall.  The School was keen to deliver 10% renewable energy sources.  This was achieved by working closely […]

Read More →

Dorchester Primary School, Surrey

We worked with Extraspace Solutions on Dorchester Primary School, a 2,000m2 school development for London Borough of Sutton which was awarded through the Crown Commercial Service Framework Agreement (formerly GPS). The redevelopment of the school involved a 10 classroom extension, followed by a second phase encompassing the demolition of the existing building entrance and offices […]

Read More →

The Stepping Hill catering block is a new build kitchen facility designed to produce up to a maximum of 4000 meals per day. The hot production area comprised of two large cooking ranges, each with individual ventilation canopies, separate areas provides specialist cold kitchen and diet bay facilities. Ancillary areas include fruit and veg preparation, […]

Read More →

Altrincham Market

We were appointed by Trafford Council to provide the M&E Design for the refurbishment and enhancement of the Grade II Listed Market House and the attached Covered Market. The objective was to create a flexible environment with a number of different catering operators and a central dining area, which would also be used as a […]

Read More →