Location pin Find Us

Retail & Leisure

Flight Club, Oxford

Our team collaborated closely with Red Engine, the end-to-end in-house development team behind the delivery of Flight Club and Electric Shuffle, to deliver an early-stage feasibility study, detailed design, and site monitoring for the MEP installation and fit-out of the new Flight Club venue. Situated on the rooftop of the Westgate Shopping Centre, this new […]

Read More →

Electric Shuffle, Manchester

Our team was appointed to provide the detailed design, construction phase duties, and contractor support for a new high-end bar and venue in Manchester. The new venue spans 11,400 sq ft, with a capacity of 450 people, it features a high-end bar, multiple private shuffleboard areas, and space for dining and drinking. Electric Shuffle offers […]

Read More →

StockRoom, Stockport

CBRE Ltd and Stockport Council have appointed S I Sealy to provide the full design for the M&E fit-out and Building & Energy Modelling for the development of StockRoom, which will re-purpose 47,000 sq ft of retail space and Adlington Walk both within Stockport town centre. Adlington Walk, a covered area off the main shopping […]

Read More →

Flight Club, Leeds

Working directly for Flight Club, our team was appointed to deliver an early-stage feasibility study, detailed design and site monitoring duties for the MEP installation and fit-out of the new venue. The venue is an iconic Grade II listed building in central Leeds which Flight Club occupies 15,890 sq ft of space on the basement, […]

Read More →

Flight Club, Bristol

The venue covering two floors on Bristol’s Corn Street offers a unique darts experience. It has a total capacity of 200 with competitive and multiplayer games from seven personal oche areas, also known as the toe line or throw line in which the dart player stands behind and a vibrant high-end bar providing food and […]

Read More →

#Destinationbootle, Merseyside

We have delivered RIBA Stage 1-3 MEP energy modelling and concept design/planning duties. We are awaiting funding/instruction to proceed with the RIBA Stage 4 MEP detailed design and construction phase duties for this £33 million development on behalf of SAFE Regeneration. SAFE’s plan is to make their community within Bootle a destination for locals and […]

Read More →

The Strand, Rochdale

The project comprises of the construction of the demolition of three existing residential and retail buildings and the construction of new residential and retail blocks and a community facility hub together with extensive external works and public realm works. The project was undertaken in two phases.  The three storey residential and retail blocks consist of […]

Read More →

Wonderlab, Bradford

The Science Museum Group has a strong tradition of delivering highly successful, world-renown interactive galleries. We were appointed by the National Science and Media Museum to refurbish an existing experience TV area to create a new science ‘Wonderlab’ to form part of the re-launch for the National Science and Media Museum in Bradford. The objective […]

Read More →

Water Street, Manchester

This project included a residential development of 301 apartments, split between one, two and three bedroom units, together with six townhouses, with a reception and a commercial unit covering 326sqm at street level. The gross area of the development, including all plant and car parking facilities, is 32,807sqm. Working for Renaker Build and with Hodder […]

Read More →

Swan Street, Manchester

This new build mixed use development consists of two storeys of retail space as well as a doctors’ surgery on the ground and first floors. These levels of the development occupy the whole site, re-building the street block that has existed for over two hundred years and allowing the building to fully address the surrounding […]

Read More →